止水帷幕局部渗漏下基坑降水非稳定流半解析解
DOI:
CSTR:
作者:
作者单位:

厦门大学

作者简介:

通讯作者:

中图分类号:

TU46

基金项目:

中铁南方2022年科技创新计划课题(202208);厦门市科技局项目(2024CXY0115)。


Semi-analytical Solution for Transient Seepage during Foundation Pit Dewatering under Local Leakage Conditions of a Cutoff Wall
Author:
Affiliation:

Fujian Key Laboratory of Digital Simulations for Coastal Civil Engineering,Department of Civil Engineering,Xiamen University

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对止水帷幕局部渗漏条件下基坑降水非稳定渗流响应缺乏有效理论模型的问题,建立了局部渗漏与坑内抽水共同作用下的轴对称二维非稳定渗流模型。模型将局部渗漏段与抽水段统一表述为内边界分段通量条件,并基于拉普拉斯变换和有限傅里叶余弦变换推导降深半解析解;通过退化工况与经典Theis解对比及COMSOL数值模拟验证模型合理性。在此基础上,以渗漏工况相对无渗漏工况的附加降深为指标,分析渗漏强度、位置及抽水时间对附加降深响应的影响。结果表明:附加降深主要集中于渗漏边界及渗漏段附近,随径向距离增大而衰减;渗漏强度、位置和抽水时间分别影响其幅值、深度分布和发展过程。

    Abstract:

    To address the lack of effective theoretical models for transient seepage responses during foundation pit dewatering under local leakage conditions of cutoff walls, an axisymmetric two-dimensional transient seepage model considering the combined effects of local leakage and in-pit pumping is established. In the model, the local leakage section and the pumping section are uniformly represented as segmented flux boundary conditions along the inner boundary. A semi-analytical solution for drawdown is then derived based on Laplace transform and finite Fourier cosine transform. The rationality of the proposed model is verified by comparison with the classical Theis solution under a degenerated leakage-free condition and by COMSOL numerical simulation. On this basis, the additional drawdown of the leakage condition relative to the leakage-free condition is adopted as the evaluation index, and the effects of local leakage intensity, leakage position, and pumping time on the additional drawdown response are analyzed. The results show that the additional drawdown caused by local leakage is mainly concentrated in the near-boundary region and around the depth corresponding to the leakage section, and gradually attenuates with increasing radial distance. An increase in leakage intensity amplifies the magnitude of the additional drawdown; changes in the leakage-section position alter the depth distribution of the high-value zone in the near-field region; and prolonged pumping time leads to the continuous development of the leakage-induced additional response. The results can provide a theoretical reference for analyzing the influence of foundation pit dewatering under local leakage conditions of cutoff walls, interpreting abnormal groundwater-level variations outside foundation pits, and conducting related parameter inversion.

    参考文献
    相似文献
    引证文献
引用本文

袁俊伟,陈东霞. 止水帷幕局部渗漏下基坑降水非稳定流半解析解[J]. 科学技术与工程, , ():

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-06-17
  • 最后修改日期:2026-09-09
  • 录用日期:2026-10-26
  • 在线发布日期:
  • 出版日期:
×
关于《科学技术与工程》全新官方网站正式上线的通知公告
关于抵制伪造参考文献学术不端行为的声明
关于规范使用生成式人工智能的声明
亟待确认版面费归属稿件,敬请作者关注