Study on Excavation Deformation Control of Shallow Tunnels in Weak Strata Based on Pipe Roof Method
Author:
Affiliation:

1. China Railway 24th Bureau Group Southwest Construction Co.,Ltd.;2.Shandong University

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对浅埋软弱地层隧道开挖沉降量大的问题,本文选择江北机场隧道作为研究对象,基于ABAQUS建立三维有限元模型,分别模拟采用管棚法(FPM)与未采用FPM的隧道开挖全过程,通过对比现场实测和模型预测沉降数据验证了有限元模型的有效性。通过实验设计分析管棚管径、管长、布设角度及横向间距对隧道沉降控制的作用规律,并通过沉降降低率(SRR)量化各参数敏感性。结果显示,采用FPM后,隧道洞口拱顶竖向位移由167.5 mm降低至41.2 mm,地表最大沉降由62.1 mm降低至36.7 mm,FPM可将拱顶沉降降低约76%,地表沉降降低约41%,有效将围岩压力传递至初期支护,提升隧道整体稳定性。管径与管长对沉降控制最敏感,SRR分别为6.9 %/cm和4.8 %/m,最优组合为管径12 cm、管长12 m,布设角度6°、横向布设间距30 cm。管棚搭接长度比不宜低于25%,保证预支护体系连续有效。管棚内力分析表明,距洞口1 m处管棚承受最大弯矩为178 kN·m,最大轴力283 kN,满足开挖过程的承载要求。研究结果可为浅埋软弱地层隧道FPM设计与施工提供理论依据和参数参考。

    Abstract:

    Aiming at the problem of large excavation settlement of shallow tunnels in weak strata, this paper takes Jiangbei Airport Tunnel as the research object. A three-dimensional finite element model is established based on ABAQUS to simulate the whole excavation process of the tunnel with and without the Pipe Roof Method (FPM). The influence laws of pipe diameter, pipe length, layout angle and transverse spacing on tunnel settlement control are analyzed, and the sensitivity of each parameter is quantified by the Settlement Reduction Rate (SRR).The results show that after adopting FPM, the vertical displacement of the tunnel portal vault decreases from 167.5 mm to 41.2 mm, and the maximum surface settlement decreases from 62.1 mm to 36.7 mm. FPM reduces the vault settlement by about 76% and surface settlement by about 41%, which can effectively transfer surrounding rock pressure to the primary support and improve the overall stability of the tunnel.Pipe diameter and pipe length are the most sensitive to settlement control, with SRR of 6.9%/cm and 4.8%/m respectively. The optimal parameter combination is pipe diameter 12 cm, pipe length 12 m, layout angle 6°, and transverse spacing 30 cm. The lap length ratio of pipe roof should not be lower than 25% to ensure the continuity and effectiveness of the pre-support system. Internal force analysis of the pipe roof indicates that the maximum axial force of 283 kN occurs at 1 m away from the tunnel portal. The research findings can provide theoretical basis and parameter reference for the design and construction of FPM in shallow tunnels within weak strata.

    参考文献
    相似文献
    引证文献
引用本文

冯龙,刘知辉. 基于管棚法的浅埋软弱地层隧道开挖变形控制研究[J]. 科学技术与工程, , ():

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-05-29
  • 最后修改日期:2026-07-24
  • 录用日期:2026-09-03
  • 在线发布日期:
  • 出版日期:
×
关于抵制伪造参考文献学术不端行为的声明
关于规范使用生成式人工智能的声明
喜报|《科学技术与工程》3篇论文成功入选 “第二十八届中国科协年会影响力提名论文”
2026年会通知 | “技术经济学驱动智能经济生态构建与治理变革”——中国技术经济学会第三十三届学术年会(2026)会议通知暨征文启事(第一轮)
亟待确认版面费归属稿件,敬请作者关注