Abstract:Nanliang-Huachi oil pipeline had the problem which the ability of pipeline transportation was seriously degraded, with the increase of fixed number of years. By combining theoretical calculation and site actual situation, research and analysis the reason which caused the ability of pipeline transportation degraded, made out two sets of scheme of pipeline cleaning. Finally, we recoveried the ability of the pipeline transportation, solved the bottleneck problem of perplexing production.