When the horizontal well is applied to explore bottom water reservoir, oil wells will product water early and reduce the oil recovery without water, because bottom water cones to horizontal well too fast. In this paper, the flow model inside wellbore of horizontal well has been developed to present a new method to delay bottom water coning through adopting step screen pipe to adjust fluid production in each division segment of the horizontal well. The method can enhance oil recovery without water through delaying the speed of bottom water coning. The actual oilfield calculation shows that the optimized arrangement step screen pipe can make the speed of bottom water coning in the horizontal identically, and delay the bottom water coning significantly.
参考文献
相似文献
引证文献
引用本文
许兰兵,李奇. 应用梯级筛管抑制水平井底水锥进研究[J]. 科学技术与工程, 2011, (26): . Xu Lanbing, Li Qi. The research for delaying the bottom water coning in horizontal wells application step screen pipe[J]. Science Technology and Engineering,2011,(26).