A mathematical model of the control system for the Boiler’s coal transfer is established based on the full investigation and in combination with the actual conditions of Yulin Guohua power station in the paper. the MATLAB/Simlink simulation environment software to present the simulation results were applied to optimize the parameter proportion of I/O motor, and the server is responsible for the motor control system in coal level measurement, the correctness of system is verified experimentally by simulation, The simulation results indicate that the proposed method could operate stably for motor of coal level in various conditions.
参考文献
相似文献
引证文献
引用本文
蒋晓雁. 发电厂煤位电机控制系统输入/输出参数比的优化研究[J]. 科学技术与工程, 2011, (12): . jiangxiaoyan. Study of Optimizing the Proportion of the Input/Output Parameters of Control System for Coal Level Motor in Power Plant[J]. Science Technology and Engineering,2011,(12).