Abstract:A salt factory workshop was used in severe corrosion environment for ages, structure damaged seriously, was unsafe very much, must be reinforced. Based on analysis and demonstration, determined that to reinforce and antisepsis the workshop by comprehensive measures of mainly CFRP-bonded. The principal points of design and construction be introduced. After construction, the workshop has been in operation more than 4 years,and it showed that reinforcing effect is good.