The linear and stress of composite-girder cable-stayed bridge will be included by the changes of some parameters during construction as a high hyperstatic structure. Simulating accurately the construction process with computer and make a analysis of the results can be the basis and reference for decision-making during construction control.
参考文献
相似文献
引证文献
引用本文
林致胜. 组合梁斜拉桥施工仿真分析[J]. 科学技术与工程, 2009, 9(21): . Lin Zhisheng. Construction Simulation of Composite-girder Cable-Stayed Bridge[J]. Science Technology and Engineering,2009,9(21).