王 谦,杨昌鸣,陆继广,等. 盾构近距离侧穿建筑遗产的施工技术分析及保护措施加固效果[J]. 科学技术与工程, 2020, 20(27): 11339-11346.
WANG Qian,LU Ji-guang,et al.Study on Construction Technology Analysis and Reinforcement Measures Effect of Shield Tunneling Close Side Crossing Architectural Heritage[J].Science Technology and Engineering,2020,20(27):11339-11346.
盾构近距离侧穿建筑遗产的施工技术分析及保护措施加固效果
Study on Construction Technology Analysis and Reinforcement Measures Effect of Shield Tunneling Close Side Crossing Architectural Heritage
投稿时间:2020-02-21  修订日期:2020-06-28
DOI:
中文关键词:  盾构施工  建筑遗产  地表沉降  二七纪念塔  数值模拟  监控量测  施工技术
英文关键词:Shield construction  Architectural heritage  Surface subsidence  Numerical simulation  Construction technique.
基金项目:国家自然科学基金项目(面上项目,重点项目,重大项目)(51478007;51978005)、北京市教委科研计划项目资助(KM201110005025)
              
作者单位
王 谦 北京工业大学北京市历史建筑保护工程技术研究中心
杨昌鸣 北京工业大学北京市历史建筑保护工程技术研究中心
陆继广 中国建筑第二工程局有限公司
徐英晋 广联达科技股份有限公司
王启力 中国建筑第二工程局有限公司
摘要点击次数: 158
全文下载次数: 81
中文摘要:
      为严格控制地表沉降,最大限度地减小施工对不可复制建筑遗产的影响,本文结合郑州地铁3号线近距离侧穿全国重点文物保护单位——二七纪念塔的实际工程,采用数值模拟和现场实测的方法,建立隧道-土体-建筑遗产的三维有限元模型,进行了盾构施工前二七纪念塔周边加固效果分析、施工技术参数优化分析、施工现场实测值与数值计算值对比分析;验证了排桩加固效果、施工技术参数选取的合理性、数值计算和监测数据的一致性。最后,有效的控制了地表沉降,顺利通过二七纪念塔,确保了其安全性和完整性,为同类工程施工提供参考。
英文摘要:
      In order to strictly control the ground subsidence and minimize the influence of construction on the non-replicating architectural heritage, this paper combined with the actual project of Zhengzhou Metro Line 3 running through the Zhengzhou Memorial Tower, a national key cultural relic protection unit, at a short distance, analyzed the shield construction technology and the effect of reinforcement measures by means of numerical simulation and field measurement. Analysis of reinforcement effect around the tower before shield construction, optimization analysis of construction technical parameters, comparison analysis of field measured value and numerical calculation value were carried out to verify the rationality of construction technical parameters selection, reinforcement effect of pile row, consistency of numerical calculation and monitoring data. Finally, it has effectively controlled the surface settlement and the shield successfully passed the memorial tower, ensuring its safety and integrity. It could provide reference for similar construction projects.
查看全文  查看/发表评论  下载PDF阅读器
关闭
你是第34861945位访问者
版权所有:科学技术与工程编辑部
主管:中国科学技术协会    主办:中国技术经济学会
Tel:(010)62118920 E-mail:stae@vip.163.com
京ICP备05035734号-4
技术支持:本系统由北京勤云科技发展有限公司设计

京公网安备 11010802029091号