首页|期刊简介|投稿指南|分类索引|刊文选读|订阅指南|资料|样刊邮寄查询|常见问题解答|联系我们
谢晓鹏,王娟,窦国涛,等. 钢栈道施工全过程抗风稳定性分析[J]. 科学技术与工程, 2020, 20(24): 10045-10051.
XIE Xiaopeng,DOU Guotao,et al.Analysis of Wind Resistance Stability of Steel Trestle Road During the Entire Construction[J].Science Technology and Engineering,2020,20(24):10045-10051.
钢栈道施工全过程抗风稳定性分析
Analysis of Wind Resistance Stability of Steel Trestle Road During the Entire Construction
投稿时间:2019-11-07  修订日期:2020-06-02
DOI:
中文关键词:  风荷载  黄河大桥 施工栈道  施工全过程
英文关键词:wind load  Pier bridge  construction plank road  The whole construction process.
基金项目:河南省科技攻关项目(182102310721);国家自然科学基金青年(51708514)
              
作者单位
谢晓鹏 郑州航空工业管理学院 土木建筑学院
王娟 郑州大学水利与环境学院
窦国涛 郑州航空工业管理学院 土木建筑学院
郑州大学水利与环境学院
河南工程学院 土木工程学院
杨露 河南工程学院 土木工程学院
高波 江苏省交通工程集团有限公司
摘要点击次数: 131
全文下载次数: 71
中文摘要:
      为研究钢栈道施工全过程的抗风稳定性问题,通过以黄河大桥施工栈道施工全过程为背景,采用有限元模拟方法对此进行了分析研究。结果表明:在横桥方向风荷载作用下,(1)钢管桩打入地基,在钢管桩之间焊接剪力撑后,其位移绝对值最大值为43.7 mm,其最大米塞斯应力为43.6 MPa;(2)钢管桩顶部焊接桩顶梁后,位移绝对值最大值为46.8 mm,其最大米塞斯应力为45.9 MPa;(3)桩顶梁上架设贝雷梁,铺设桥面板后,位移绝对值最大值为0.76 mm,其最大米塞斯应力为19.6 MPa。可见在横桥向风荷载作用下,从位移和应力角度来分析,钢管桩顶部焊接桩顶梁后为最不利情况。
英文摘要:
      In this study, finite element analysis was implemented on the steel trestle road of the Yellow River Bridge to investigate its wind-resistant stability during the entire construction. In the experiment, steel pipe piles were driven into the foundation and welded with crossing braces among them. It is found that: (1) those steel pipe piles are subjected to a maximum absolute displacement of 43.7 mm, which corresponds to a maximum Mises stress of 43.6 MPa, under the wind load that is perpendicular to the bridge; (2) with beams welded on the pile top, those pipe piles experience a maximum absolute displacement of 46.8 mm, corresponding to a maximum Mises stress of 45.9 MPa; (3) amounting beret beams on the pile-top beams and laying bridge deck slabs contribute to a significantly dropped maximum absolute displacement to 0.76 mm, corresponding to a maximum Mises stress of 19.6 MPa. Therefore, it is the most disadvantageous to weld beams on the pile top under the wind load that is perpendicular to the bridge, as it results in the largest displacement and Mises stress.
查看全文  查看/发表评论  下载PDF阅读器
关闭
你是第33213422位访问者
版权所有:科学技术与工程编辑部
主管:中国科学技术协会    主办:中国技术经济学会
Tel:(010)62118920 E-mail:stae@vip.163.com
京ICP备05035734号-4
技术支持:本系统由北京勤云科技发展有限公司设计

京公网安备 11010802029091号