王 洋,姜殿科,初 军,等. 市区地下电力管廊爆破安全管理探索[J]. 科学技术与工程, 2020, 20(29): 11969-11973.
WANG Yang,JIANG Dian-ke,CHU Jun,et al.Exploration on Safety Management of Urban Underground Power Tunnel blasting[J].Science Technology and Engineering,2020,20(29):11969-11973.
市区地下电力管廊爆破安全管理探索
Exploration on Safety Management of Urban Underground Power Tunnel blasting
投稿时间:2019-10-14  修订日期:2020-06-24
DOI:
中文关键词:  地下电力管廊 振动速度检测 爆破安全管理
英文关键词:underground power tunnel  vibration speed monitoring  blasting security management
基金项目:国家电网有限公司科技项目资助(2019YF-44)
              
作者单位
王 洋 大连理工大学 工业装备结构分析国家重点实验室
姜殿科 国网辽宁省电力有限公司大连供电公司
初 军 国网辽宁省电力有限公司大连供电公司
周 明 国网辽宁省电力有限公司大连供电公司
闫鸿浩 大连理工大学 工业装备结构分析国家重点实验室
摘要点击次数: 77
全文下载次数: 36
中文摘要:
      随着城市化建设对土地资源的合理化应用愈加迫切,地下电力管廊为高压线路的选择提供了良好的建设方案。为保证高效的建设效率和降低建设成本,矿山法爆破技术得到了广泛应用。然而城市地下及地表环境复杂,涉及多方面安全管控因素,必须严格把控爆破施工所面临的各种风险。以大连市南雁四回路输电线路改造工程为例,引进爆破安全评估和监理以及第三方爆破振动速度监测的方法,阐述其在爆破工程安全管理中应用。针对环境复杂的敏感地段,需要在爆破施工开展前召开专家咨询会,共同协商决定施工方案,同时时刻关注第三方爆破振动速度的监测数据,实时指导调整爆破参数,保证爆破施工的顺利、安全、高效开展。
英文摘要:
      As the rational application of land resources in the construction of urbanization becomes more and more urgent, the underground power pipeline provides a good construction scheme for the selection of high-voltage lines. In order to ensure the efficiency and control the cost of construction, blasting technology of mine has been widely used. However, the underground and surface environment of the city are complex, involving many security factors, and various risks of blasting construction must be strictly controlled. Here taking the Reconstruction Project of Nanyan Four Circuit Electric Transmission Line as an example, the means of blasting safety evaluation, blasting safety supervision and third-part vibration monitoring were introduced, and the application in the safety management of blasting engineering was expounded. As for complex environment and sensitive areas, the construction plan need to be decided through the expert consultation meeting, combined with vibration speed monitoring data from the third part before blasting construction. So that the blasting parameters can be adjusted dynamically to ensure the smooth, safe and efficient process.
查看全文  查看/发表评论  下载PDF阅读器
关闭
你是第33881787位访问者
版权所有:科学技术与工程编辑部
主管:中国科学技术协会    主办:中国技术经济学会
Tel:(010)62118920 E-mail:stae@vip.163.com
京ICP备05035734号-4
技术支持:本系统由北京勤云科技发展有限公司设计

京公网安备 11010802029091号