李小龙,张汝生,孙志宇,等. 新召东致密气藏水平井整体压裂技术[J]. 科学技术与工程, 2020, 20(24): 9869-9880.
LI Xiao-long,ZHANG Ru-sheng,SUN Zhi-yu,et al.Research on Horizontal Well Integral Fracturing in Tight Gas Reservoir of East Xinzhao[J].Science Technology and Engineering,2020,20(24):9869-9880.
新召东致密气藏水平井整体压裂技术
Research on Horizontal Well Integral Fracturing in Tight Gas Reservoir of East Xinzhao
投稿时间:2019-10-09  修订日期:2020-06-04
DOI:
中文关键词:  水平井压裂  整体压裂 裂缝形态  布井方案 数值模拟
英文关键词:horizontal  well fracturing  integral fracturing  fracture morphology  well layout  scheme simulation
基金项目:国家科技重大专项“碎屑岩复杂裂缝形成机理及水平井压裂优化方法研究”(2016ZX05002-005-006);国家科技重大专项“缝洞型油藏堵调及酸压工艺技术”(2016ZX05014-005-007)
                 
作者单位
李小龙 中国石化石油勘探开发研究院
张汝生 中国石化石油勘探开发研究院
孙志宇 中国石化石油勘探开发研究院
李月丽 中石化华北石油局石油工程技术研究院
、中石化华北石油局石油工程技术研究院
蒋艳芳 中石化华北石油局石油工程技术研究院
、中石化华北石油局石油工程技术研究院
梁志彬 中石化华北石油局石油工程技术研究院
、中石化华北石油局石油工程技术研究院
摘要点击次数: 133
全文下载次数: 61
中文摘要:
      新召东井区即将进入规模评价开发阶段,需开展整体压裂研究。以基于弹性开发的气田整体采收率、井组收益率为评价指标,从井组布井方案及单井裂缝参数两个方面进行针对性研究,基于产能模拟明确布井方案及其设计思路,基于裂缝扩展模拟明确整体压裂下单井的裂缝形态。研究表明,考虑储层的非均质性时,布井应向河道沉积中部集中,可有效提高整体产能,相同井距下四井井组的产能可达到五井井组产能的94%;非均匀布井方案可提高整体产能,且井距越大非均匀布井的效果越好。根据研究结论最终确定布井方案为半缝长195m、井距690m、导流能力100mD.m、缝间距50-60m,并通过外侧两井中线的位置进行非均匀布井方案的调整。
英文摘要:
      As the block of East Xinzhao is about to be large scale developed, it is necessary to research the integral fracturing technology. The aspect of well layout scheme of well group and fracture parameters of single well are studied and evaluated based on the recovery of filed, earning rate of well group in elastic development reservoir. The well layout scheme and design are determined through production simulation. The fracture morphology is studied by fracturing propagation simulation. The results show that the well layout scheme should be concentrated in the middle of river sedimentation in order to improve the production of well group when the heterogeneity of reservoir is taken into consideration. The production of group of 4 wells is 94% of that of group of 5 wells. The larger the space of wells, the better of effect of production improvement is in the condition of heterogeneous reservoir. The optimization results in the end is fracture half-length of 195m, well space of 690m, conductivity of 100mD·m, fracture space of 50~60m. The adjustment of well layout scheme is based on the location of the center line of the 2 wells on the outside.
查看全文  查看/发表评论  下载PDF阅读器
关闭
你是第33212799位访问者
版权所有:科学技术与工程编辑部
主管:中国科学技术协会    主办:中国技术经济学会
Tel:(010)62118920 E-mail:stae@vip.163.com
京ICP备05035734号-4
技术支持:本系统由北京勤云科技发展有限公司设计

京公网安备 11010802029091号