地震作用下者拉母箐尾矿坝稳定性分析
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P315.9; TU435

基金项目:


Stability Analysis of Zhelamujing Tailing Dam under Earthquake
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    尾矿库堆积坝是矿山生产设施的重要组成部分,坝体稳定性不足引起的溃坝事件是尾矿库的一种严重病患。本文采用不排水有效应力法对者拉母箐尾矿坝进行了地震响应分析,计算了尾矿坝在地震作用下的安全系数。分析得出安全系数满足规范要求,者拉母箐尾矿坝在8度地震作用下是稳定的。这种分析方法也为尾矿坝的稳定性评价提供了参考。

    Abstract:

    Tailings storehouse is the most important project of mine-enterprise, and the dam-break by the poor stability is a serious disaster. In this paper, the effective stress method without drainage is applied to the seismic response analysis of the Zhelamujing tailing dam, and the dynamic safety factor of the tailing dam is calculated. The results indicated that the safety factor meet regulatory requirements, and Zhelamujing tailing dam is stable under 8-degree earthquake. The results provided references to evaluation method for stability analysis of tailings dam.

    参考文献
    相似文献
    引证文献
引用本文

周洋洋. 地震作用下者拉母箐尾矿坝稳定性分析[J]. 科学技术与工程, 2010, (11): .
zhouyangyang. Stability Analysis of Zhelamujing Tailing Dam under Earthquake[J]. Science Technology and Engineering,2010,(11).

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-01-22
  • 最后修改日期:2010-01-30
  • 录用日期:2010-02-03
  • 在线发布日期: 2010-03-12
  • 出版日期:
×
律回春渐,新元肇启|《科学技术与工程》编辑部恭祝新岁!
亟待确认版面费归属稿件,敬请作者关注